SEYRANTEPE HEPP (2X30 MW)

SEYRANTEPE HEPP (2X30 MW)

Mechanical erection, test and commissioning support of generators (2x30  MVA), two vertical francis turbines & two inlet valves and related BOP & auxiliaries.

Electrical basic and detailed design, equipment supply, panel manufacturing, erection, test and commissioning of electrical LV and MV BOP & Control & Automation & Protection & 154kV switchyard (Including switchyard civil work) on turnkey basis.

Other Works in the Scope of This Project

Basic and detailed design, equipment supply, panel manufacturing, civil work, erection, test and commissioning of 2X30 MW 11/154 kV transformers and 5 Nos 154 kV Feeder.

Electrical basic and detailed design, Control Panels Manufacturing, erection, test and commissioning of electrical LV and MV BOP & 154kV switchyard Control & Automation of Seyrantepe HEPP.

  • Client: DARENHES
  • Place : ELAZIĞ
  • Date: 2008