ALPASLAN II HEPP (2x116,73 MW + 2x31,33 MW)

ALPASLAN II HEPP (2x116,73 MW + 2x31,33 MW)

Mechanical erection, test and commissioning support of generators (2x116,73 MW + 2x31,33 MW), four vertical francis turbines, four inlet valves and related BOP & auxiliaries. Scope includes also design, equipment supply, erection and commissioning of complete Mechanical BOP.

Electrical basic and detailed design, equipment supply, panel manufacturing, erection, test and commissioning of electrical LV and MV BOP & Protection & 380kV switchyard on turnkey basis.

Other Works in the Scope of This Project

Mechanical Design of LP Compressed Air System, Cooling Water System, Drainage&Dewatering Systems, Oil Treatment System.

  • Client: ENERGO-PRO
  • Place : MUŞ
  • Date: 2020