Shuakhevi HEPP Unit 2 Rotor has been lowered into the pit successfully

Shuakhevi HEPP Unit 2 Rotor has been lowered into the pit successfully

Within the scope of Rotor pole modification at Shuakhevi HEPP (2x99,28 MVA) owned by AGL, Unit 2 Rotor has been lowered into the pit successfully by GES & GE service teams.

© 2022 GES Genel Elektrik Sistemleri Yapım ve Mühendislik A.Ş